Product/ Insurance/ GRC integration
GRC Risk Connect integration

GRC’s recommendations, live in 21RISK

Every recommendation in Risk Connect, matched one to one with a risk improvement your sites already know how to work. Their response goes to GRC, the engineer’s verdict comes back, and every change is on record.

GRC_8f3c…e21a IN SYNC
21RISK Sprinkler impairment
Risk Connect Rec 25-03-07
Responsible Lars Holm
responseFrom Lars Holm
Due date 15 Jun 2026
expectedCompletionDate 2026-06-15
Cost estimate €42,000
costToCompleteActual 42000
Status In progress
intendedAction In Progressstatus Outstanding
Category Sprinklers
secondaryType Sprinklers
Loss estimate after €2.5M
completedLossEstimate 2500000
21RISK owns, sent to GRC GRC owns, brought into 21RISK
01 · Live

From a report on the shelf to work in motion

A survey report is out of date the day after it is issued. In 21RISK each of GRC’s recommendations becomes a risk improvement with an owner, a due date, a cost and a status, and it stays in step with Risk Connect three times a day.

The engineer’s next visit starts from what the site has actually done, not from last year’s PDF.

GRC Property risk survey · Aalborg plant · Mar 2025
Recommendations
25-03-07 Sprinkler impairment, hall B
25-03-08 Thermography of main switchboard
25-03-09 Hot work permit system
Static. Out of date the day after it is issued.
risk improvements LIVE
LH 25-03-07 Sprinkler impairment, hall B Due 15 Jun · ⚡ synced 08:41 IN PROGRESS
MK 25-03-08 Thermography of main switchboard Due 01 May · ⚡ synced 08:41 APPROVED
SJ 25-03-09 Hot work permit system Due — · ⚡ synced 08:41 COMPLETED
Live. Owned, dated and in step with Risk Connect.
02 · Reconciled 1:1

Every recommendation accounted for, one to one

Each recommendation is linked to exactly one risk improvement by its GRC id, so the two systems can be compared line by line, not total against total.

The GRC settings page counts recommendations in Risk Connect against linked improvements, for every GRC site, and points at the one that is missing. Download the full comparison as Excel, with GRC’s and 21RISK’s value side by side.

insurance / settings / grc / sync status 1 TO CHECK
In Risk Connect 194
Linked in 21RISK 193
Matched 1:1 99.5%
GRC siteSiteIn GRCIn 21RISKDiff
DK-0412Aalborg plant6464✓
FR-1188Lyon plant4141✓
DE-0730Hamburg DC3837-1
SE-0261Linköping plant2929✓
GB-0907Leeds plant2222✓
03 · Nothing new to learn

Your sites already know how to work it

Site managers answer GRC in 21RISK, on the same risk improvements, saved views, reminders and comments they use for every other recommendation. No Risk Connect login, no second system, no export to fill in before the survey.

A comment written this morning is GRC’s facility comment by the next run.

insurance / risk-improvements AALBORG PLANT
25-03-07 Sprinkler impairment, hall B 15 Jun IN PROGRESS
LH
Quote from the sprinkler contractor approved. Installation booked for week 24
25-03-08 Thermography of main switchboard 01 May QUOTE APPROVED
24-09-02 Hot work permit system 30 Apr OVERDUE
04 · Every source

GRC’s recommendations, next to everyone else’s

GRC is one source among many. Recommendations from your insurers’ and brokers’ surveys, other engineering firms and your own inspections sit in the same register, on the same sites, worked the same way.

Bring them in from the report PDF, through the API or by hand. Engineering report import reads GRC’s, Paragon’s and IF’s layouts and other insurers’ and brokers’ reports with a general reader. Filter on the source when you need one firm’s list, and only GRC’s sync with Risk Connect.

insurance / risk-improvements 352 OPEN
Source GRC 214IF 38Codan 22Marsh 17Self-inspection 61
⚡GRC 25-03-07 Sprinkler impairment, hall B Aalborg IN PROGRESS
IF Thermal imaging of switchgear Linköping PLANNED
Codan Separate battery charging area Aalborg IN PROGRESS
Marsh Business continuity plan for line 2 Leeds COMPLETED
Self-inspection Clear storage under mezzanine Hamburg OVERDUE
05 · Full audit trail

Every change on record, in both directions

Each run is listed with its time, what started it and the recommendations it updated. Open one to see every field it changed in Risk Connect, with the value before and after.

Changes from GRC land in each risk improvement’s own history, marked as made by the GRC sync. A dry run shows what a run would change before anything is written.

grc / sync jobs / 412 DONE
Started08:41 UTC Triggered bysystem Updated in GRC3 Duration2.4 s
  1. 25-03-07 Sprinkler impairment, hall B Aalborg plant
    responseFrom — Lars Holm
    expectedCompletionDate 2026-05-01 2026-06-15
  2. 24-09-02 Hot work permit system Lyon plant
    intendedAction Agree - Evaluating Options Agree - Will Complete
  3. 25-01-11 Housekeeping, raw material store Aalborg plant
    costToCompleteActual — 8500
06 · Agents

Let an agent decide where the capex goes

GRC’s loss estimates come into 21RISK with every recommendation, next to your own cost estimates. Ask an agent which open recommendations lower the expected loss most per euro, which fit this year’s budget, or which site is falling behind, across GRC and every other source.

Use 21RISK’s AI chat, or Claude, ChatGPT and Copilot through the MCP server. The NLE reduction is worked out the way the risk improvements page explains: per site and period, never summed.

chat AGENT
We have €100k of capex left this year. Which open GRC recommendations lower our expected loss the most per euro?
queried risk improvements · Sync GRC synced · Status open · 214 rows

These three fit in €82k and add €23.7M of NLE reduction this period. The sprinkler impairment alone is two thirds of it.

RecommendationNLE addedCost€ per €
25-03-07 Sprinkler impairment, hall B Aalborg€15.5M€42k369
25-02-11 Fire wall penetrations Lyon€6.2M€28k221
25-02-03 Hydrant ring main repair Hamburg€2.0M€12k167

I left out 25-01-04 at Aalborg: closing the sprinkler impairment there first already covers its loss estimate.

How it works

Linked once, then in sync three times a day

A recommendation is linked when its engineering report is imported. After that, the site’s response and the engineer’s verdict cross between the two systems on their own.

Risk ConnectGRC
21RISKYour team and sites
  1. 01 Survey Risk Connect

    The engineer writes it up

    After the site visit, GRC enters the recommendations in Risk Connect and issues the report.

  2. 02 Import 21RISK

    The report is imported

    Each recommendation is matched on its GRC file and rec number and linked to Risk Connect.

  3. 03 Respond 21RISK

    The site works it

    An owner, a due date, a cost and comments, on the same register as every other improvement.

  4. 04 Sync Risk Connect

    GRC sees the response

    The next run writes the response into Risk Connect, so nobody retypes it.

  5. 05 Verdict Risk Connect

    The engineer decides

    Conf Completed, Advisory or Removed. Only GRC’s engineers give a verdict.

  6. 06 Sync 21RISK

    The status follows

    The improvement takes the status you mapped to the verdict, and the site sees it after the next run.

The import reads the report and matches each recommendation to Risk Connect. See engineering reports for how a report becomes risk improvements.

Schedule

Three runs a day, each in two steps

At 00:41, 08:41 and 16:41 UTC, 21RISK copies every recommendation from Risk Connect and sends the site’s changes to GRC.

14 minutes later it brings GRC’s changes into 21RISK. A response written in the morning is in Risk Connect by the afternoon, and the engineer’s verdict is on the site’s list after the next run.

0006121800:4108:4116:41every8 hoursUTC
  • 00:41 UTC
  • 08:41 UTC
  • 16:41 UTC
What syncs

Every field has one owner

The site owns its response. GRC owns its engineering. Each run sets every field to its owner’s value, so the two systems agree again after every run.

what syncs 10 FIELDS
21RISK → Risk Connect The site’s response. 21RISK owns these, and a run overwrites an edit made in Risk Connect.
Responsible
responseFrom
The responsible person’s name.
Due date
expectedCompletionDate
Sent when the dates differ.
Cost estimate
costToCompleteActual
Sent as the amount on the improvement.
Status
intendedAction
The intended action you mapped to the status, such as Agree - Will Complete.
Comments
facilityComment
Every comment with its author and date, replacing the facility comment.
Risk Connect → 21RISK GRC’s engineering. GRC owns these, and a run overwrites an edit made in 21RISK.
Status
status
Conf Completed, Advisory and Removed set the status you mapped. Other GRC statuses leave the site’s.
Category
primaryType, secondaryType
The secondary type, under the primary type. A category 21RISK lacks is created.
Loss estimate before
currentLossEstimate
The engineer’s estimate today.
Loss estimate after
completedLossEstimate
The estimate once the recommendation is done.
Name
recYear, recMonth, recNumber, recSubletter, keywords
Named like 25-03-07 Sprinkler impairment. A maintenance recommendation starts with M (M25-03-07), a part of one ends with a letter (25-03-07A).
VERDICTS

Only GRC confirms completion

Map Conf Completed, Advisory and Removed to your statuses and protect them with a status rule, so nobody else can close a recommendation from GRC.

CATEGORIES

GRC’s categories, without a mapping

Improvements are filed under GRC’s primary and secondary type. A category 21RISK doesn’t have yet is created on the next run.

DRY RUN

See a run before it happens

Start a dry run from the GRC settings page. It records every change it would send to Risk Connect, field by field, and writes nothing.

FAQ

Frequently asked questions

What is GRC Risk Connect?

Risk Connect is where TÜV SÜD Global Risk Consultants (GRC) keeps the recommendations from its property risk engineering surveys, with the site’s response to each one. 21RISK connects to it through GRC’s client API.

Which fields does the sync change, and in which direction?

From 21RISK to Risk Connect: responsible (responseFrom), due date (expectedCompletionDate), cost estimate (costToCompleteActual), status as an intended action, and comments (facilityComment). From Risk Connect to 21RISK: GRC’s verdict as a status, the category (primaryType and secondaryType), the loss estimates before and after (currentLossEstimate and completedLossEstimate) and the name.

How often does it run?

Three times a day, at 00:41, 08:41 and 16:41 UTC. Each run first copies every recommendation from Risk Connect and sends 21RISK’s changes to GRC, then 14 minutes later updates the risk improvements with GRC’s changes. An administrator can also start the first half by hand from the GRC settings page.

Do our site teams need a Risk Connect login?

No. They work the recommendations as risk improvements in 21RISK, where they already work, and the sync writes their response into Risk Connect.

What happens when both sides change the same field?

Every field has one owner, and the owner’s value wins at the next run. A due date edited in Risk Connect is set back to 21RISK’s, and a loss estimate edited in 21RISK is set back to GRC’s. Status is the one field with two halves: the site’s response goes to GRC as an intended action, and GRC’s verdict comes back as a status.

Can someone in 21RISK mark a GRC recommendation as completed?

Not if you protect the status. You map GRC’s verdicts (Conf Completed, Advisory and Removed) to statuses in 21RISK, and a status rule keeps people from setting those statuses on improvements linked to GRC. A linked improvement that sits in a verdict’s status without GRC’s verdict moves to the status you chose for “otherwise”. GRC’s other statuses, such as Outstanding and Rptd Completed, leave the site’s status alone.

Does the sync create new recommendations in 21RISK?

No. Recommendations arrive with the engineering report. When the report is imported, each recommendation is matched to Risk Connect on its GRC file number and rec number and linked by its GRC id. From then on the sync keeps it current, and reconciliation shows any recommendation in Risk Connect that has no risk improvement yet.

What goes into the facility comment in Risk Connect?

Every comment on the risk improvement, each with the name of the person who wrote it and the date. The text replaces the facility comment in Risk Connect, so GRC sees the whole thread in one place. A risk improvement without comments leaves the facility comment as it is.

What if GRC uses a category 21RISK doesn’t have?

The sync creates it, as GRC’s secondary type under its primary type, and files the improvement there. Your categories end up matching GRC’s without anyone keeping a mapping.

Which agents can prioritise the recommendations?

21RISK’s own AI chat, and Claude, ChatGPT or Microsoft Copilot through the 21RISK MCP server. They read the same risk improvements you see, including the cost estimate, the loss estimates and the NLE reduction closing each one would add this period, and they can only see what the person asking can see.

What do we need to set it up?

The Enterprise plan, an Insurance board, and the client API id and password GRC gives you for Risk Connect. You enter them on the GRC settings page, where the password can be replaced but never read back.

Already working with GRC? Bring the recommendations to life

Talk to us about the recommendations in your last GRC survey, and see them live on your own sites.