Product/ Insurance/ Risk improvements
Risk improvements

Recommendations, tracked from report to evidence

Risk improvements are the recommendations that reduce property risk — from engineering reports, insurers, brokers or your own reviews. Each one carries an owner, a due date, a cost, and the evidence that it was done.

The problem

The engineering report lands, and then what?

Getting the recommendations is the easy part. Turning twenty of them, across forty sites, into work that actually happens is where the register breaks down.

The report is a PDF

The engineer writes twenty recommendations and sends a document. A document is not a worklist, and nobody can filter it.

No owner, no date, no cost

A recommendation without a name and a deadline attached is a suggestion. Suggestions survive several renewals.

You cannot show progress

The insurer asks what happened to last year’s recommendations, and the answer is a search through email and a best guess.

How it works

One follow-up register for every recommendation

Risk improvements live on the Insurance board — what was identified, who owns it, when it is due, what it costs and what evidence supports it.

  1. 01

    The report arrives

    From an engineering firm, your insurer or broker, an internal review, or the site team itself — registered against the site it belongs to.

  2. 02

    Recommendations become improvements

    Each one gets an owner, a due date, a cost estimate, and loss estimates before and after — so it can be prioritised rather than just listed.

  3. 03

    Track it to evidence

    Subtasks, files, comments and change history, so completion is something you can show an underwriter rather than assert.

insurance / risk-improvements 12 OPEN · 3 OVERDUE
SP Install ESFR sprinklers, hall B IN PROGRESS€340k · loss −€12.4M
EL Replace main switchboard, Lyon plant PLANNED€85k · loss −€3.1M
FP Upgrade fire doors, Hamburg DC COMPLETEDevidence attached
HK Clear storage from sprinkler zone OVERDUEfrom 2026 survey
Features

What you get with risk improvements

PROTECTED

The engineer’s words stay the engineer’s

Improvements created from an engineering report can protect the original name, description, loss estimates, external ID and site — so the recommendation an insurer made is still the recommendation on file.

COST & LOSS

Argue for the budget with numbers

Cost estimate alongside loss estimate before and after, so the case for a sprinkler upgrade is a figure rather than an opinion.

EVIDENCE

Completion you can show

Files, subtasks, comments and full change history — quotes, photos and sign-off attached to the improvement they belong to.

FAQ

Frequently asked questions

Where do risk improvements come from?

Internal reviews, insurance audits, engineering reports, risk engineers, brokers or local site teams. However a recommendation arrives, it ends up in the same follow-up register on the Insurance board.

What stops someone editing the engineer’s recommendation?

When an improvement originates from an engineering report, fields such as the name, description, loss estimates, external ID and site can be protected, so the original recommendation stays intact. Group owners can override that protection when they need to.

Can we work from a list of what is overdue or unassigned?

Yes. The risk improvements table supports saved views, so recurring worklists — overdue, unassigned, high loss estimate, or one site, category or responsible person — are one click rather than a filter you rebuild each time.

What if one recommendation takes several steps?

An improvement can hold subtasks with their own owners, due dates and completion state — requesting quotes, approving budget, planning an outage window, installing, and collecting the evidence at the end.

Turn recommendations into completed work

Talk to us about the recommendations sitting in your last engineering report.